The Mumbai-Ahmedabad Bullet Train Project has achieved another major milestone with the successful breakthrough of its third mountain tunnel, MT-07, in Maharashtra’s Palghar district. The tunnel, located at Ambesari village in Dahanu Taluka, measures 417 metres in length and 14.4 metres in width and is designed to accommodate both up and down tracks of the high-speed rail corridor.
